pmsesampling
Sample Size Determination for Accurate Predictive Linear Regression
v0.1.1
·
Sep 9, 2025
·
MIT + file LICENSE
Description
Provides analytic and simulation tools to estimate the minimum sample size required for achieving a target prediction mean-squared error (PMSE) or a specified proportional PMSE reduction (pPMSEr) in linear regression models. Functions implement the criteria of Ma (2023) <https://digital.wpi.edu/downloads/0g354j58c>, support covariance-matrix handling, and include helpers for root-finding and diagnostic plotting.
Downloads
508
Last 30 days
7804th
1.5K
Last 90 days
3.2K
Last year
Trend: +2% (30d vs prior 30d)
CRAN Check Status
14
OK
Show all 14 flavors
| Flavor | Status |
|---|---|
| r-devel-linux-x86_64-debian-clang | OK |
| r-devel-linux-x86_64-debian-gcc | OK |
| r-devel-linux-x86_64-fedora-clang | OK |
| r-devel-linux-x86_64-fedora-gcc | OK |
| r-devel-macos-arm64 | OK |
| r-devel-windows-x86_64 | OK |
| r-oldrel-macos-arm64 | OK |
| r-oldrel-macos-x86_64 | OK |
| r-oldrel-windows-x86_64 | OK |
| r-patched-linux-x86_64 | OK |
| r-release-linux-x86_64 | OK |
| r-release-macos-arm64 | OK |
| r-release-macos-x86_64 | OK |
| r-release-windows-x86_64 | OK |
Check History
OK 14 OK · 0 NOTE · 0 WARNING · 0 ERROR · 0 FAILURE Mar 10, 2026
Dependency Network
Version History
new
0.1.1
Mar 10, 2026