ProjectManagement
Management of Deterministic and Stochastic Projects
Description
Management problems of deterministic and stochastic projects. It obtains the duration of a project and the appropriate slack for each activity in a deterministic context. In addition it obtains a schedule of activities' time (Castro, Gómez & Tejada (2007) <doi:10.1016/j.orl.2007.01.003>). It also allows the management of resources. When the project is done, and the actual duration for each activity is known, then it can know how long the project is delayed and make a fair delivery of the delay between each activity (Bergantiños, Valencia-Toledo & Vidal-Puga (2018) <doi:10.1016/j.dam.2017.08.012>). In a stochastic context it can estimate the average duration of the project and plot the density of this duration, as well as, the density of the early and last times of the chosen activities. As in the deterministic case, it can make a distribution of the delay generated by observing the project already carried out.
Downloads
357
Last 30 days
10722nd
981
Last 90 days
6.4K
Last year
Trend: -3.8% (30d vs prior 30d)
CRAN Check Status
Show all 14 flavors
| Flavor | Status |
|---|---|
| r-devel-linux-x86_64-debian-clang | OK |
| r-devel-linux-x86_64-debian-gcc | OK |
| r-devel-linux-x86_64-fedora-clang | OK |
| r-devel-linux-x86_64-fedora-gcc | OK |
| r-devel-macos-arm64 | OK |
| r-devel-windows-x86_64 | OK |
| r-oldrel-macos-arm64 | OK |
| r-oldrel-macos-x86_64 | OK |
| r-oldrel-windows-x86_64 | OK |
| r-patched-linux-x86_64 | OK |
| r-release-linux-x86_64 | NOTE |
| r-release-macos-arm64 | OK |
| r-release-macos-x86_64 | OK |
| r-release-windows-x86_64 | OK |
Check details (1 non-OK)
DESCRIPTION meta-information
Dependence on R version ‘4.3.3’ not with patchlevel 0
Check History
NOTE 12 OK · 2 NOTE · 0 WARNING · 0 ERROR · 0 FAILURE Mar 10, 2026
DESCRIPTION meta-information
Dependence on R version ‘4.3.3’ not with patchlevel 0
DESCRIPTION meta-information
Dependence on R version ‘4.3.3’ not with patchlevel 0